top of page

Projects

Our track record in the sector

Regiotram 2_edited_edited.png
Regiotram de Occidente

Study and development of the Software Management Plan PGS, Software Quality Assurance Plan, and Software Configuration Management Plan for the construction, execution, and commissioning phases of the project.

metro bogota1.jpg
Bogotá Metro

Rolling stock supervision for monitoring, oversight, manufacturing, factory testing, supply, installation, and on-site commissioning; supervision of CBTC systems, onboard train communication systems, platform screen doors and their interface with rolling stock, as well as RAMS management for rolling stock.

Regiotram_edited.jpg
Regiotram del Norte

Feasibility-level studies and designs for the operation and commercial exploitation plan.
Development and design study of the power supply system and overhead catenary system.
Operator’s organizational structure for OPEX estimation and fare collection system design.
CAPEX and OPEX calculations.

train valley_edited.png
Commuter train Valle del Cauca

Advanced feasibility-level studies and designs of railway systems.
Preparation and development of the RAMS Management Plan and the Interface Management Plan, including the safety case for the TCV system.

COCHABAMBA METROPOLITAN TRAIN.jpg
Cochamba Metropolitan Train

Engineering review and integration of civil works with railway and non-railway technological systems and subsystems, including their interfaces with rolling stock.
Supervision of railway and non-railway works and installations, as well as supervision of commissioning activities.

biocenaico_edited.jpg
Central Bioceanic Railway Corridor

Comparative techno-economic analysis of traction alternatives applicable to the project.

Santa Cruz.jpeg
Mass transit traction systems in Santa Cruz de la Sierra

Comparative techno-economic analysis of traction alternatives applicable to the project.

ferrocarriil antioquia.jpg
Antioquia Railway

Pre-feasibility level studies and designs of railway systems for Section 1 and Section 3.
Feasibility level studies and designs of railway systems for Section 2.
Project optimization process using the Value Engineering analysis method.

© 2035 by LFGRISALES CONSULTING. Powered and secured by Wix

bottom of page